PROJECTS

Below is a sample of some of the projects we have worked on.

No Picture

Kilmore Hotel - Cavan
Innotech Building Management System

In 2017 DC Controls completed the upgrading of the heating plant from discreet control to a full building energy management system. This upgrade also included a number of new panels complete with controls to manage the new extension of the hotel. The System consists of 90 rooms each with their own Mod-Bus room controller, which are connected back to the front end PC and can be fully adjusted through the graphic package. This site has over 500 BMS points and 800 modbus and bacnet points

Ballymun Leisure Centre - Ballymun
Innotech Building Management System

Dublin City Council has two swimming pools (the main pool and a separate activity pool), a large gym area, and both studio and changing area as part of its Ballymun Complex.In 2016 DC Controls working in conjunction with Noel Lawlor Green Energy Solitions upgraded the BEMS. This involved replacing all the pumps with VSD driven pumps and fine tuning the system control for maximum efficiency. The plant consists of boilers, calorifiers, AHUs, a combined heating power unit, pool heat exchanger control, water treatment, and pool temperature control. This site has over 800 BMS points.

No Picture
No Picture

Finglas Leisure Centre - Finglas
Innotech Building Management System

Dublin City Council has a state of the art 25m swimming pool as part of its new complex in Finglas, Dublin. A childcare centre, a four storey regional civic office, a youth centre and 6 outdoor floodlit pitches make up the entire development. In 2016 DC Controls working in conjunction with Noel Lawlor Green Energy Solitions upgraded the BEMS. This involved replacing all the pumps with VSD driven pumps and fine tuning the system control for maximum efficiency. The plant consists of boilers, calorifiers, AHUs, a combined heating power unit, pool heat exchanger control, water treatment, and pool temperature control. This site has over 600 BMS points.

Markievicz Leisure Centre - Dublin
Innotech Building Management System

Dublin City Council has a swimming pool, gym area, studio and changing area in its Markievics complex. In 2016 DC Controls working in conjunction with Noel Lawlor Green Energy Solitions upgraded the BEMS. This involved replacing all the pumps with VSD driven pumps and fine tuning the system control for maximum efficiency. The plant consists of boilers, calorifiers, AHUs, a combined heating power unit, pool heat exchanger control, water treatment, and pool temperature control. This site has over 350 BMS points.

No Picture
No Picture

Supervalu - Rathoath
Innotech Building Management System

In 2016 DC Controls working in conjunction with Noel Lawlor Green Energy Solitions upgraded the BEMS from Sea Change controls to Innotech building energy management system. The plant consists of boilers, calorifiers, AHUs (including one with a gas fire burner), and Toshiba air conditioning control units. This site has over 400 BMS points.

Ardcath School - Ardcath
Innotech Building Management System

In 2016 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, a calorifier, an immersion heater, and underfloor heating. This site has over 200 BMS points.

No Picture
No Picture

Westwood Fitness - Dun Laoire
Innotech Building Management System

In 2017 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of AHUs, calorifiers, jacuzzi temperature control, and indux units. This site has over 300 BMS points.

Fishamble
Innotech Building Management System

In 2016 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, calorifiers, and district heating for apartments. This site has over 200 BMS points.

No Picture
No Picture

Pavilions - Dun Laoire
Innotech Building Management System

In 2016 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, VSD driven Pumps, and district heating for apartments. This site has over 250 BMS points.

Jameson - Old Irish Distillery
Innotech Building Management System

In 2017 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of 3 AHUs. This site has over 120 BMS points.

No Picture
No Picture

Redmills
Innotech Building Management System

In 2016 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of an AHU. This site has over 60 BMS points.

Clanwilliam Place
Innotech Building Management System

In 2016 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of a Boiler and a calorifier. This site has over 80 BMS points.

No Picture
No Picture

Grand Canal House
Innotech Building Management System

In 2016 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, caorifier, an immersion heater, zoned temperature control. This site has over 120 BMS points.

Titanic Hotel - Belfast
Innotech Building Management System

In 2017 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, and caorifiers, AHUs, VSD driven Pumps. This site has over 400 BMS points.

No Picture
No Picture

Fiat,Turnpike House - Naas Road
Innotech Building Management System

In 2017 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, and a caorifier. This site has over 100 BMS points.

Seanchara
Innotech Building Management System

In 2017 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, a caorifier, immersion heaters, and an AHU. This site has over 200 BMS points.

No Picture
No Picture

Hartstown
Innotech Building Management System

In 2017 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, and a caorifier. This site has over 200 BMS points.

Standard Life
Innotech Building Management System

In 2017 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. The plant consists of boilers, calorifier (with anti strat pump), and AHUs. This site has over 150 BMS points.

No Picture
No Picture

St. John of Gods - Stillorgan
Innotech Building Management System

In October 2015 DC Controls completed the upgrading of all the heating plant, comprising of 5 individual plantrooms, from discreet control to a full building energy management system. The system is complete with target and monitoring and utilises a Combined Heating Power unit. This site has over 600 BMS points.

Highbridge House - Reading, UK
Innotech Building Management System

In December 2015 DC Controls completed the upgrading of all the heating plant from discreet control to a full building energy management system. This site has over 120 BMS points.

No Picture
No Picture

Canary Wharf - London
Cylon Building Management System

DC Controls carried out the commissioning of the tower block in Canary Wharf in conjuction with Eton Controls. This is a Large scale office building complex with 10 office buildings, 92,900m2. Control of local temperature and electrical supply management is managed by the Cylon system.

Royal Victorian Eye and Ear Hospital
Innotech Building Management System

DC Controls has recently completed the upgrading of all the heating plant from discreet control to a full building energy management system. The system is complete with target and monitoring and utilises a Combined Heating Power unit. This site has over 400 BMS points.

No Picture
No Picture

Irish Dairy Board / Kerry Foods
Innotech Building Management System

DC Controls has recently completed the upgrading of all the heating plant from discreet control to a full building energy management system. The system is complete with target and monitoring. This site has over 350 BMS points.

Aegon IFSC
Innotech Building Management System

DC Controls has carried out BEMS maintenance on this site for the last 8 years and in 2014 completed the upgrading of the BMS System from TAC to an Innotech control system. The site consists of the complete second floor of IFSC House. This site has over 500 BMS points. The plant consists of VAV units, communication rooms monitoring, leak detection monitoring, Edpac Air conditioning monitoring and Fire suppression monitoring.

No Picture
No Picture

Morehampton Foods
Innotech Building Management System

In 2013 DC Controls completed the installation of a new Innotech BMS control system. The site is an 18,000 sq ft (1670 2)production Kitchen that runs 24 hours a day 7 days a week. This site has over 200 BMS points. The plant consists of Boilers, Calorifiers and Air Handling Units.

Merrion Hall
Innotech Building Management System

DC Controls has carried out BEMS maintenance on this site for the last 7 years and in 2013 completed the upgrading of the BMS System from Cylon to an Innotech control system. The site is a 62000 sq. ft (5760 sq. m.) three storey office building. This site has over 500 BMS points. The plant consists of Boilers, Calorifiers, Chillers, Air Handling Units, Waterside fan coil units and reheats.

No Picture
No Picture

Callystown School
Innotech Building Management System

In 2014 DC Controls completed the installation of a new Innotech BMS control system. The school comprises of 14 classrooms. This site has over 120 BMS points. The plant consists of Boilers, Calorifiers and individual zone control.

Arran Square
Innotech Building Management System

In 2013 DC Controls completed the installation of a new Innotech BMS control system. This site has over 100 BMS points. The building is made of two four storey buildings which are split into individual office throughout. Each block consists of Boilers, Calorifiers and individual zone control. They have no front end on site, but use internet access, through the Innotech IWS01, to change and monitor the system.

No Picture
No Picture

Fidelity - Citywest
Cylon Building Management System

In 2013 DC Controls completed the upgrade of the Cylon BMS control system. The site is a three storey office block on the Citywest Campus. This site has over 1000 BMS points. The plant consists of Boilers, Calorifiers, Chillers, Air Handling Units, Mitsubishi Air conditioning units (via Modbus) and generator monitoring.

Cranmer House - London
Innotech Building Management System

In 2015 DC Controls completed the installation of a new Innotech BMS control system. This site has over 100 BMS points. The building is a three storey office block and the plant consists of Boilers, Calorifiers and individual zone control. There are energy meters fitted to all zones for future target and monitoring. They have no front end on site, but use keypad access, through the Innotech MP01, to change and monitor the system.

No Picture